-
Clean Narthex and Sanctuary (Worship Committee
& Altar Guild)
-
Clean large plate glass windows. CLC, Narthex and Fellowship Hall Entry.
(NEED COORDINATOR)
-
Clean Sunday School Class Rooms (EACH
CLASS IS RESPONSIBLE)
-
Clean choir room and restrooms. (NEED
COORDINATOR)
-
Clean behind Sanctuary Choir Loft. (NEED
COORDINATOR)
-
Clean Balcony. (NEED COORDINATOR)
-
Clean warming kitchen. (NEED COORDINATOR)
-
Remove spider webs from reachable exterior
locations. (NEED COORDINATOR)
-
Clean debris from building "moat". (NEED
COORDINATOR)
-
Complete phase 1 installation of LED
lights in 46 EXIT lights. (Jim Lundy; 1-3 helpers needed)
-
Repair door lock
on the door to the warming kitchen in the fellow ship hall. (Jeff Glaze)
-
Exterior Light out above entrance to
children's wing, by courtyard. (NEED COORDINATOR)
-
Overhang light outside CLC double doors
(near main level bathrooms) was full of water.
-
Large light pointing up at top cross
(outside); gasket broken. (NEED COORDINATOR)
-
Repaint sign at corner. (NEED COORDINATOR)
-
Mold on wall around the sink in the
Janitor's closet. (NEED COORDINATOR)
-
Several bathroom fans not working. (NEED
COORDINATOR)
-
Bottom of nursery
door is scraping the floor, needs to be fixed so floor is damaged. (NEED
COORDINATOR)
-
Replace stained ceiling tiles as needed.
(NEED COORDINATOR)
-
Additional tasks as identified by the
Board Of Trustees.